18' Manual Batch

REV. 9-30-96

Figure #26

Leveling Band Post

2nd hole from sidewall

Leveling Band Post

6th hole from sidewall

S-277

5/16" x 1.1/4"

Bin Bolt

Optional Rotary Switch

LEVELING BAND POST INSTALLATION

Install the leveling band posts on the floor as shown.

The second and sixth holes in the beam indicate the location of the leveling band posts. Attach posts with 5/16" x

1.1/4" bin bolts (S-277). In the second hole from the bottom of the sheet, there will be 6 posts (1 every third sheet).

In the sixth hole there will be 6 posts (1 every third sheet). After all of the posts have been installed fill the unused

holes with 5/16" x 1.1/4" bin bolts.