Outer dump chutes, Figure #29, Flashing splice installation – Grain Systems PNEG-365 User Manual

Page 26

Advertising
background image

Grain Systems, Inc. Assumption, Ill.

26

18' Manual Batch

#10 Self-drilling Screws

(S-280)

TD-100648

Eave Flashing

(as viewed from inside the bin)

TD-100649

Eave Flashing

Splice

OUTER DUMP CHUTES

Bolt a TD-100598 angle dam to each dump chute using (3)1/4" x 5/8" bolts and nuts, as shown below. Use 1/4" x

5/8" bolts and double nuts to fasten dump chutes to hopper. Do not tighten first nut down. Lock second nut to first

nut and make sure chutes raise and lower FREELY!

TD-100647

Dump Hopper Assembly

S-1102

1/4" Nut (2 per bolt)

Lock together. Don't

tighten first nut down

S-1102

1/4" Nut (1 per bolt)

S-1429

1/4" x 5/8" Bolt

TD-100598

Angle Dam

TD-100017

Dump Chute

Figure #29

REV. 9-30-96

The flashing splice pieces can now be attached to the eave flashing to seal around the rib of the floor sheet as shown

with (S-280) #10 self-drilling screws. The flashing splice is a break apart piece. Attach the center piece in the center

so that it rests on top of the floor sheet rib. Break off the side pieces and place them such that they seal against the sides

of the ribs and attach each side piece with two screws. Make sure there are no gaps in the flashing.

FLASHING SPLICE INSTALLATION

Top Ring

Advertising