Check

List

9 Determine optimum mounting location for the probe based on the parameters being measured and/or

controlled

9 Determine optimum mounting location for 5200 Monitor
9 Fabricate probe mounting plate if necessary
9 Mount the probe
9 Connect the probe to the monitor
9 Make wiring connections for relays
9 Make wiring connections for communication ports
9 Make wiring connections for DC power
9 Make ground wiring connections
9 Verify that all wiring connections are secure
9 Apply industrial encapsulant to conduit fittings-if applicable
9 Insert desiccant pack(s) into 5200 Monitor
9 Reinstall front cover to 5200
9 Recheck grounding and surge protection installations
9 Allow probe circuitry and sensors to warm up for several minutes
9 Calibrate the probes and program the monitor’s software
9 Place calibrated probe in mounting fixture

3.4 Mount the YSI 5200 Recirculating System Monitor

Several options are available for mounting the 5200 Monitor. Easy to use, wall mount brackets (6515
Flange Mounting Kit) are provided. If rail or panel mounting is desired, the 6509 Rail Mount Kit and
6510 Panel Mount Kits are available as accessories.

3.4.1

Wall Mounting Option

Although the monitor is designed for outdoor deployment, some operators may prefer the convenience of
reading the monitor under shelter, for example, inside a nearby building. Figure 3-4 shows this indoor
type of installation. Wall-mounting the 5200 Monitor is a simple process using the enclosed 006515
mounting hardware.