YSI 5200 User Manual

Page 21

Advertising
background image

YSI Incorporated

19

5200 Recirculating System Monitor

Figure 3-6 Adapter Position

The following steps should be followed when mounting the 5205 or 6511 Probe Mount Kit.

1. With the 3 setscrews removed from the adapter, slide the adapter over the 5562 Probe. Align the

open screw holes directly over the 3 hex bolts located on the side of the 5562 Probe.

2. Insert the setscrews so that they seat into the head of the probe’s hex bolts.

CAUTION: Do not over-tighten the setscrews or damage to the probe body or adapter may

occur.

NOTE: The 5562 Probe Assembly can be deployed without the probe guard attached. When doing so,

application related precautions must be considered or system performance can be compromised.
Deployment without the guard is preferred as the effects of low water flow and fouling are
reduced, but exposed sensors or the DO membrane, can be damaged if not properly protected.

3. Attach the stop cap to the end of a PVC pipe using PVC cement, as per instructions on the cement

can label, ensuring that the stop cap is positioned straight and the pipe is fully inserted.

4. 5205 Only: Firmly mount PVC pipe to permanent structure. Skip to Step 9.

5. Loosely fasten two 1½” u-bolts on each mounting plate to the railing, orientated as shown in

Figure 3-7.

Figure 3-7 6511 U-Bolt Mounting

6. Loosely attach the 2” u-bolts to the mounting plates, orientated as shown in Figure 3-7.

2” U-Bolts

Mounting
Plates

1.5” U-Bolts

Probe Guard

Stop Cap

Adapter

Set Screw

5562 Probe Body

2” PVC Tube

Advertising