16 final inspection checklist – Alpha Technologies AlphaGen PN-6x-T 7.5kW 48VDC - Technical Manual User Manual

Page 53

Advertising
background image

042-288-B0-001, Rev. A

53

3.0 Installation,

continued

3.16 Final Inspection Checklist

Set the ECM Run/Auto/Stop (RAS) switch to the STOP position before initially powering up the
ECM. This allows the operator to manually control the START and STOP functions of the APU until
the system is set up. This also prevents the APU from starting unexpectedly.

CAUTION!

Once the installation is complete, verify the following:

1. Engine oil at proper level

2. All electrical connections securely made

3. Engine Control Module (ECM) set to STOP

4. Battery connections made

5. Battery voltage normal.

6. Gas connections checked for leak integrity

7. Gas pressure normal

When the above checks are complete, the unit is ready for initial turn-up.

Advertising
This manual is related to the following products: