Connection with timer programming and photovoltaic, Signal – DE DIETRICH KALIKO TWH 200E - TWH 300E - TWH 300EH User Manual

Page 42

Advertising
background image

4.9.6.

Connection with timer programming and
photovoltaic signal

3

AC type differential switch

4

Circuit breaker

5

Photovoltaic panel

6

Inverter

A

Power cable 1,5 mm

2

4

The heat pump and electrical

backup are allowed to operate

depending on the time program.
4

The heat pump will start to heat

at the temperature of 62 °C

(parameter P07) when the

photovoltaic signal is actif.
4

If the photovoltaic signal is actif

when the contact is open, set

the parameter P04 on 3.
4

If the photovoltaic signal is actif

when the contact is closed, set

the parameter P04 on 4.

C004218-B

A

TEST

16 A

40 A

2 A

30

mA

L

N

X11-2 HP/H

PV-S

DC

AC

X11-1 LINE

C

3

5

6

4

4

4. Installation

TWH 200E TWH 300E TWH 300EH

40

03/02/2014 - 300026515-001-03

Advertising