Burkert Type 2012 User Manual

Page 14

Advertising
background image

14

Replacingthesealset

Type 2000, 2002, 2012

Assemble packing gland set

7

,

13

,

14

,

15

,

16

in the tube

8

in the right sequence (see detailed

drawing).

Chevron seal

Pressure rings

Chevron seal

16

Pressure spring

7

Figure 2:

Packing gland set

Push packing gland into the tube

8

as far as the stop; clamp nipples

6

to do this and screw in packing

gland set with screw

18

. Remove screw

18

again.

Mount actuator body

12

, disk springs

17

and screw

18

on the tube

8

.

Screw

18

with socket spanner; ensuring that the disk springs

17

are in a central position.

Lubricate spindle

2

lightly with silicone grease OKS 1110-3 and insert suitable assembly sleeve over

spindle thread.

For information about the assembly sleeve see chapter “8. Installation tools”.

Insert spindle through nipple

6

into actuator and remove assembly sleeve.

for control function a: Place filler piece

19

on spindle.

for control function B: Insert pressure springs

35

.

for control function i: Insert filler piece

19

.

Place intermediate washer

20

and lightly lubricated O-ring

21

on spindle.

the following operations must only be carried out with all valves:

Lubricate mounting actuator body

12

lubricant Amblygon TA.

Remove old piston seal

23

from pistons

22

clean groove and lubricate well; lubricant Amblygon TA.

Insert new piston ring

23

.

Insert pistons

22

and supporting washer

24

and lightly lubricate bearing surface.

Wet spindle thread

2

with special adhesive LOCTITE 274 and screw on nut

25

.

english

Advertising
This manual is related to the following products: