Aerobell 168 - maintenance – Ransburg Aerobell 168 A12787 User Manual

Page 72

Advertising
background image

Aerobell 168 - Maintenance

69

LN-9270-12.3

MAINTENANCE DISASSEMBLY PROCEDURES

(65mm Bell Cup and Shape Air Ring)

Step 3

Locate the Cup Wash Fitting that
is mounted on the Shape Air
Ring.

Step 4

Remove the Cup Wash Fitting
from the Shape Air Ring.

When assembling the Cup
Wash Fitting, tighten with fin-
gers until an audible “click” is
heard.

Note: Be careful not to drop the
Cup Wash Ferrule.

Make sure when assembling
the Cup Wash Fitting that the
ferrule taper end is inserted
into the Cup Wash Fitting.

Advertising