Aerobell 168 - maintenance, Maintenance disassembly procedures – Ransburg Aerobell 168 A12787 User Manual
Page 79
Advertising
![background image](/manuals/348102/79/background.png)
Aerobell 168 - Maintenance
LN-9270-12.3
76
MAINTENANCE DISASSEMBLY PROCEDURES
Step 18
Remove the Turbine (no tool required).
Pull straight off.
The Turbine sealed with a O-ring and
may be difficult to remove.
Step 19
Note the alignment marks.
Step 20
Note: Two (2) locating pins are
mounted on the back of the Turbine
to insure proper alignment.
When assembling these pins will eas-
ily insert when the alignment marks
are properly matched.
N O T E
Advertising