Chapter 3. multi-tasking – IAI America S-SEL-E User Manual

Page 103

Advertising
background image

Page 98

Chapter 3. Multi-tasking

5.

Program Switching

There are several ways to switch programs depending on the program operating application but the typical methods are
described below.

External Start

Program Switching

Program

Single task

EXIT Command

Multi task

EXPG Command

(1) External Start

Refer to Chapter 2 Part 3.
After the power is turned on, input a program No. and execute the designated program by external start input.
After the first program, another designated program can be executed by inputting the program No. and external start
input.

(2) Program

Single task
Executing the EXIT command (program end) after each program, completes programs and returns the controller
to the original status (the time power was turned ON). However, home position is maintained. Another program
No. can be designated, and the program can be switched by external start input.

Multi-task
Execute the EXPG command (start up other program) within the management program and programs are executed
one after another in parallel.

Advertising
This manual is related to the following products: