Install Control Box Upper Closeout

Hood Installation

Thumb screws

Keyholes

Some components removed for clarity. Right side shown, left side similar if applicable.

Fire Suppression Piping (optional)

1. Install one (1) Control Box Upper Closeout Panel above upper Control Box.
2. Line up shoulder bolts located near top of panel with keyholes in bracket, allow panel to drop into place.
3. Install thumb screws from conveyor side through previously installed bracket, thread into Control Box Upper

Closeout Panel.

4. Repeat for left side if ovens have left hand control boxes.

Control Box Upper
Closeout Panel