Invalid Ref F, SPH, SPL, or DP

When the enough reference fluctuation value is

not obtained, an alarm of invalid reference value

for each parameter is generated and also the ILBD

operation is not carried out.
Confirm the alarm of

Invalid Ref F, SPH, SPL, or

DP is not displayed in Diag Error.
If an alarm of

Invalid Ref F, SPH, SPL, or DP is

generated, consider the process condition or obtain

the reference fluctuation values again.

NOTE

Even if an alarm of

Invalid Ref F, SPH, SPL, or

DP is generated, “Calculation” in Diag Mode is

kept.

4.2.2.8 Capability Test of Blockage

Detection Operation

Before performing the ILBD operation, check the

capability of the blockage detection operation.

The simulation test is performed by closing motion

of a three-valve manifold or stop valve. When

simulated blockage occurs, confirm that an alarm is

generated.

NOTE

The fluctuation amplitude of atmospheric

pressure is nearly zero with pressure or level

measurement. In such case, simulate the

blockage detection by closing the valve where

the fluctuation existed.

Simulation of High-pressure Side

Blockage

1) Close the high-pressure-side valve.

2) Confirm the value of

Pres is stable. If not,

open the valve a little.

3) Set “Calculation” to

Diag Mode so as to start

blockage detection operation.

4) Check that an alarm of “H Side Blocking” is

generated after the time that consists of

Diag

Period and Diag Supp Count passed.

5) Check also the operation of the analog alert if

an analog alert is set.

6) Open the valve completely and check that

there are no alarms.

Simulation of Low-pressure Side

Blockage

1) Close the low-pressure-side valve.

2) Confirm the value of

Pres is stable. If not,

open the valve a little.

3) Set “Calculation” to

Diag Mode so as to start

blockage detection operation.

4) Check that an alarm of “L Side Blocking” is

generated after the time that consists of

Diag

Period and Diag Supp Count passed.

5) Check also the operation of the analog alert if

an analog alert is set.

6) Open the valve completely and check that

there are no alarms.

Simulation of Both-pressure Side

Blockage

1) Close the both-pressure-side valves.

2) Confirm the value of

Pres is stable. If not,

open the valve a little.

3) Set “Calculation” to

Diag Mode so as to start

blockage detection operation.

4) Check that an alarm of “B Blocking” is

generated in the

Diag Error after the time

that consists of

Diag Period and Diag Supp

Count passed.

5) Check also the operation of the analog alert if

an analog alert is set.

6) Open the valve completely and check that

there are no alarms.

4.2.2.9 Start ILBD Operation

If process condition and capability to detect a

blockage are confirmed, you can start the ILBD

operation according to the following procedure.

1) Check the value of sampling period (

Diag

Period).

2) Check the number of times that detect the

blockage consecutively in order to give an

alarm (

Diag Supp Count). The default value

at the shipment is set to 3 times.

3) Set “Calculation” to

Diag Mode.

If the reference value has not yet been

obtained, set “Reference” to

Diag Mode.

After obtained the reference values, the

ILBD starts automatically. At the same time,

Diag Mode changes automatically from

“Reference” to “Calculation”.

Advertising
This manual is related to the following products: