Maintenance – Yokogawa digitalYEWFLO (DY) User Manual

Page 62

Advertising
background image

MAINTENANCE

IM 1F2B4-01-YIA
Page 66

4.1.8

Activating mis-matched pipe schedule (bore) correction

The mating pipe in a vortex meter installation should be schedule 40 pipe, using other schedule pipes can
cause small errors. If a pipe schedule other than schedule 40 is being used the error can be corrected using
the pipe effect correction.

Mis-matched pipe schedule correction

BT200 handheld terminal

BT100 handheld terminal

D: adjust

Select menu D: adjust and
press e

nter .

Press m e

nu until d: adjust

is displayed.

d05: pipe effect
Wafer Sch80

Scroll to the d05: pipe effect
parameter and press
enter .

Press the p r m tr key until
the D05: pipe effect menu
appears.

Select from the list the correct
combination of process
connection (wafer or flange)
and pipe schedule, (Sch10,
Sch80 etc.), and press
enter twice.

Using the inc or d e

c

keys, select the correct
combination of process
connection and pipe schedule,
press e

nt twice.

Pipe schedule correction is now invoked, and accuracy will be corrected for the combination selected.

Model

Size

Wafer

Flange

Sch 10

(%)

Sch 40

Sch 80

(%)

Sch 10

(%)

Sch 40

Sch 80

(%)

YF101

½” (15 mm)

0

-0.8

0

0.1

YF102

1” (25 mm)

0

No

-0.7

0

0.1

YF104

1½” (40 mm)

-0.2

Correction

-0.3

0

0.1

YF105

2” (50 mm)

0.1

-0.9

0

No

0.1

YF108

3” (80 mm)

0.2

0.2

0.1

Correction

0

YF110

4” (100 mm)

0.2

-0.1

0.1

0

YF115

6” (150 mm)

NA

NA

NA

0.3

-0.1

YF120

8” (200 mm)

NA

NA

NA

0.3

-0.1

YF125

10” (250 mm)

NA

NA

NA

0

0

YF130

12” (300 mm)

NA

NA

NA

0

0

Advertising