Install spray line support brackets, Front view – Hired-Hand Mega-Cool rev 4-08 User Manual

Page 18

Advertising
background image

Part No. 4801-5093 Rev 4-08

Unitized System

Page 18




































































Install Spray Line Support Brackets

1. Make sure BackPlate is at proper framing height.

2. Attach spray line support brackets with #8 x ½” TEK screws at the pre-drilled hole positions as

shown in diagram above.

Side View

Front View

BackPlate

Spray line support
bracket

Locate and attach top support brackets

at pre-drilled hole positions

of back plate.

“A

#8 x ½”

Advertising
This manual is related to the following products: