Star Water Systems SJ10 User Manual

Page 17

Advertising
background image

17

95 North Oak Street • Kendallville, IN 46755 • © 2014 Star Water Systems. All rights reserved.

pUMp eleCTRiCAl CONNeCTiONS

Wire

from

motor

Wire from

power

supply

Ground Screws

5. Connect the green ground wire from the

power supply to the remaining green ground

screw in the pressure switch and re-attach

the pressure switch cover.

5

pUMp pRiMiNG AND STARTUp

CAUTiON: all pumps must be primed

by filling the cavity with water before they are

first operated. This may take several gallons

of water, as the suction line will be filled in

addition to the cavity of pump.

1. Remove priming plug or pressure gauge at

the top of the discharge tee and the vent

plug in front of the discharge tee.

Priming plug

or pressure

gauge

Vent plug

1

2. Slowly fill the discharge tee with water until

water overflows the vent plug. It may be

necessary to repeat this process several

times to be sure pump and pipes are

completely filled.

NOTE: It will take several minutes to fill the

pump and all pipes completely.

Vent Plug

Opening

2

Advertising
This manual is related to the following products: