Installing hardware options, Setting up a tower server – HP ProLiant ML370 G5 Server User Manual
Page 33
Setup 33
•
Operating system or application software
•
PDU
Installing hardware options
Install any hardware options before initializing the server. For options installation information, refer to the
option documentation. For server-specific information, refer to "Hardware options installation (on page
Setting up a tower server
Follow the steps in this section to set up a tower model server. If you are going to install the server into a
rack, refer to the rack installation section ("
Installing the server into the rack
" on page
1.
Connect peripheral devices to the server.
WARNING:
To reduce the risk of electric shock, fire, or damage to the equipment, do not plug
telephone or telecommunications connectors into RJ-45 connectors.
2.
Connect the power cord to the rear of the server.
3.
Open the power cord retaining clip, and thread the power cord through the retaining clip.
4.
Push the tab into place to secure the power cord.
5.
Connect the power cord to the AC power source.