Setup 34

WARNING:

To reduce the risk of electric shock or damage to the equipment:

Do not disable the power cord grounding plug. The grounding plug is an important safety
feature.

Plug the power cord into a grounded (earthed) electrical outlet that is easily accessible at all
times.

Unplug the power cord from the power supply to disconnect power to the equipment.

Do not route the power cord where it can be walked on or pinched by items placed against
it. Pay particular attention to the plug, electrical outlet, and the point where the cord

extends from the server.

Installing the server into the rack

To install the server into a rack with square, round, or threaded holes, refer to the instructions that ship

with the rack hardware kit.
If you are installing the server into a telco rack, order the appropriate option kit at the RackSolutions.com
website (

http://www.racksolutions.com/hp

). Follow the server-specific instructions on the website to install

the rack brackets.

CAUTION:

Always plan the rack installation so that the heaviest item is on the bottom of the

rack. Install the heaviest item first, and continue to populate the rack from the bottom to the top.

WARNING:

This server is very heavy. To reduce the risk of personal injury or damage to the

equipment:

Observe local occupational health and safety requirements and guidelines for manual
material handling.

Get help to lift and stabilize the product during installation or removal, especially when the
product is not fastened to the rails. When the server weighs more than 22.5 kg (50 lb), at

least two people must lift the server into the rack together. A third person may be required

to help align the server if the server is installed higher than chest level.

Use caution when installing the server in or removing the server from the rack; it is unstable
when not fastened to the rails.

1.

Install the server and cable management arm into the rack. For more information, refer to the
installation instructions that ship with the 3-7U Quick Deploy Rail System (rack installation only).

2.

Connect peripheral devices to the server.

Powering up and configuring the server

To power up the server, press the Power On/Standby button.
While the server boots, RBSU and the ORCA utility are automatically configured to prepare the server for

operating system installation.
To configure these utilities manually:

Press the F8 key when prompted during the array controller initialization to configure the array
controller using ORCA.