Hardware configuration, 36 basic behavior in 3dc cascading configuration – HP StorageWorks XP Remote Web Console Software User Manual

Page 91

Advertising
background image

R-VOL/

Primary data

volume

Master

JNLVOL

Restore

JNLVOL

Primary site

Intermediate

site

Secondary
site

M-VOL

Secondary
data volume

I/O

I/O finished

Transfer

asynchronously

Transfer
synchronously

Finished storing

data

Figure 36 Basic Behavior in 3DC Cascading Configuration

If a TCz Synchronous pair is suspended in a 3DC cascading configuration, you will be able to

resynchronize the pair by using differential copy. If a URz pair is suspended, you will be able to

resynchronize the pair by using differential copy.

NOTE:

To perform disaster recovery from a failure in the primary site in a 3DC cascading configuration, you

must ensure that the fence level of the TCz Synchronous M-VOL is Data (CRIT=Y (ALL))). If this fence level

is specified, you can perform disaster recovery by using the URz secondary data volume that contains

the data stored in the TCz Synchronous M-VOL.

Hardware Configuration

This section explains hardware configuration for a 3DC cascading configuration using TCz Synchronous

and UR-z/OS. In a 3DC cascading configuration, three XP storage systems are required. It is

recommended that Business Continuity Manager is installed on hosts in the primary site, the intermediate

site, and the secondary site. XP Remote Web Console computers are required for these sites. The

following explains hardware configuration for these sites.

Primary site
• The XP storage system must have TCz Synchronous installed.
• The XP storage system must have TCz Synchronous M-VOL.
• Storage system settings must be made so that Business Continuity Manager can be used. For

detailed information about settings required for using volumes in a remote site, please refer to

Business Continuity Manager User’s Guide.

Intermediate site
• The XP storage system must have TCz Synchronous installed.
• The XP storage system must have URz installed.
• The XP storage system must have a volume used as both a TCz Synchronous R-VOL and a

URz primary data volume.

• The XP storage system must have a URz master journal volume.
• Storage system settings must be made so that Business Continuity Manager can be used. For

detailed information about settings required for using volumes in a remote site, please refer to

Business Continuity Manager User’s Guide.

Remote site
• The XP storage system must have URz installed.
• The XP storage system must have a URz secondary data volume.
• The XP storage system must have a URz restore journal volume.
• Storage system settings must be made so that Business Continuity Manager can be used. For

detailed information about settings required for using volumes in a remote site, please refer to

Business Continuity Manager User’s Guide.

Hitachi Universal Replicator for z/OS user guide for XP12000/XP10000 Disk Arrays and SVS 200

91

Advertising
This manual is related to the following products: