Hardware configuration – HP StorageWorks XP Remote Web Console Software User Manual

Page 94

Advertising
background image

Master
JNLVOL

Restore
JNLVOL

Primary
site

URz

secondary site

Sec. data
VOL

S-VOL

JNLVOL

TCz Synchronous

(short distance)

URz
(long distance)
(for use as an alternative)

TCz Synchronous

secondary site

P-VOL: primary volume
S-VOL: secondary volume
Prm. data VOL: primary data volume
Sec. data VOL secondary data volume

P-VOL/Prm.
data VOL

URz

(long distance)

JNLVOL: journal volume

Figure 37 3DC Multi-target Configuration (Combining URz with TCz Synchronous)

In this configuration, the primary volume in the primary site is paired with the secondary volume for TCz

Synchronous. This primary volume is also paired with the secondary volume for URz. If a host in the

primary site writes data to the primary volume, the data will be written to the TCz Synchronous secondary

volume in real time, synchronously with writing from the host. The data will also be written to the URz

secondary data volume, asynchronously with writing from the host. Update sequence consistency will be

maintained with the URz secondary data volume.
Since writing from the URz primary volume to the URz secondary volume is performed asynchronously

with writing from the host to the primary volume, this configuration can prevent delay in response to the

host even if the URz primary site and the URz secondary site are far from each other.
In addition, you can create the URz pair for delta resync operation in 3DC multi-target configuration,

by specifying TCz Synchronous R-VOL in the TCz Synchronous secondary site as the URz primary data

volume, and by specifying the volume in the URz secondary site as the URz secondary data volume. If

you create the URz pair for delta resync operation, you can resynchronize the URz pair by using journal

data in the TCz Synchronous secondary site when a failure occurs in the primary site.
For detailed information about the hardware configuration required for 3DC multi-target

configuration, see

Hardware Configuration

” on page 94. For detailed informa­

tion about the requirements to create a URz pair for delta resync operation, see

Requirements for Creating URz Pair for Delta Resync Operation

” on page 96. As for the requirements to

perform delta resync operation, see “

Requirements for Performing Delta Resync Operation

” on page 96.

If a failure occurs in a TCz Synchronous primary volume, which is also used as a URz

primary data volume, you can resume business tasks by using the TCz Synchronous secondary

volume. After you resume business tasks, you need to remove the failure from the primary

volume and transfer business tasks back to the primary site. For details, see sections

Recovering from Failures in the Primary Site and the TCz Synchronous Secondary Site

” on page 104

through

Transferring Business Tasks from the URz Secondary Site to the Primary Site

” on page 105.

If a failure occurs in both the primary volume and the TCz Synchronous secondary volume, you can

resume your business tasks by using the URz secondary data volume. After you resume business tasks,

you need to remove the failure from the primary volume and the TCz Synchronous secondary volume, and

transfer business tasks back to the primary site.

Hardware Configuration

A computer system in 3DC multi-target configuration requires the following three sites:

Primary site for both TCz Synchronous and URz

Secondary site for TCz Synchronous

Secondary site for URz

94

Preparing for Universal Replicator z/OS Operations

Advertising
This manual is related to the following products: