The primary site), Figure 39 – HP StorageWorks XP Remote Web Console Software User Manual

Page 99

Advertising
background image

Table 24 Changes of URz Pair Status by Delta Resync Operation (When Recovering

from Failures in the Primary Site)

URz Pair

Pair Status before Delta

Resync Operation

Pair Status after Delta Resync Operation

Primary Data

Volume

Secondary

Data

Volume

Primary Data

Volume

Secondary Data

Volume

URz pair between TCz

Synchronous primary site

and URz secondary site

Duplex or

Suspend

Duplex or

Suspend

Hold

Hold

URz pair between TCz

Synchronous secondary

site and URz secondary

site

Hold

Hold

Duplex or Pending

Duplex

Duplex or Pending

Duplex

NOTE:

In order to transfer business tasks back to the primary site, please remove failures in the primary

site and other locations, and then follow the instructions in

Transferring Business Tasks from TCz

Secondary Site to the Primary Site (When Delta Resync Operation is Performed in 3DC multi-target

configuration)

.102

Figure 39 Recovery from Disaster in the Primary Site (When Delta Resync Operation

is Performed)

Changing to 3DC Multi-target Configuration after Recovering from Primary Site Failures

If you follow the operation procedure in section 3.8.6.5 and then the system does not change to 3DC

cascading configuration, you can change the system into 3DC multi-target configuration after removing

failures from the primary site and other locations, The resulting 3DC multi-target system uses the former

TCz secondary volume as a primary volume.
To change the system into 3DC multi-target configuration:

Use Business Continuity Manager to execute the YKDELETE command on the journal group

corresponding to the former URz pair.

Hitachi Universal Replicator for z/OS user guide for XP12000/XP10000 Disk Arrays and SVS 200

99

Advertising
This manual is related to the following products: