Configuration) – HP StorageWorks XP Remote Web Console Software User Manual

Page 100

Advertising
background image

If pair re-synchronization has not been performed to reverse the primary volume and the remote

volume of the TCz Synchronous pair (i.e., if the pair is suspended), use Business Continuity

Manager to execute the YKRESYNC command, so that the copy direction of the TCz Synchronous

pair will be reversed.

M-VOL

JNLVOL

Restore
JNLVOL

URz

Master

JNLVOL

R-VOL

JNLVOL

Restore

JNLVOL

URz

Master

JNLVOL

業務

Tasks

業務

Tasks

TCz
Synchronous

TCz
Synchronous

TCz Synchronous
secondary site

TCz Synchronous
secondary site

URz
secondary site

URz
secondary site

Primary site

Primary site

R-VOL/Prm.
data VOL

M-VOL/Prm
.data VOL

Sec. data VOL

Sec. data VOL

M-VOL: main volume

R-VOL: remote volume

Prm data VOL: primary data volume

Sec. data VOL: secondary data volume

JNLVOL: journal volume

Figure 40 Changing into 3DC Multi-target Configuration After Recovering from

Primary Site Failures

Transferring Business Tasks from TCz Secondary Site to the Primary Site (in 3DC Cascading

Configuration)

If you follow the operation procedure in

Recovering from Failures in the Primary Site and the TCz Synchronous Secondary Site

” on page 104 the

system will be changed to 3DC cascading configuration, you can transfer your business tasks back to the

primary site after removing failures from the primary site and other locations.
To transfer your business tasks back to the primary site, follow the procedure below. Business Continuity

Manager is used in this procedure:

1.

Stop business tasks at the TCz Synchronous secondary site.

2.

Use Business Continuity Manager to execute the YKSUSPND FORWARD command to the TCz

Synchronous pair.

NOTE:

YKSUSPND is a command for splitting a pair and stopping the copy operation temporarily.

3.

Use the primary volume in the primary site to resume your business tasks.

4.

Use Business Continuity Manager to execute the YKRESYNC FORWARD command on the TCz

Synchronous pair, so that the copy direction of the TCz Synchronous pair will be returned to the

original state. The system configuration changes to the original 3DC multi-target configuration.

NOTE:

YKRESYNC is a command for re-establishing a pair.

100

Preparing for Universal Replicator z/OS Operations

Advertising
This manual is related to the following products: