Goulds Pumps 3180-86 - IOM User Manual
Page 93
13. If your pump is equipped with an oil cooler, install the cooler assembly as follows (as viewed from the
coupling end):
a) Install one tube fitting with a straight bore on the left side of the frame in the tapped opening
provided.
b) Slide the finned tube through the hole on the right side of the frame.
c) Install the reducer bushing on the right side of the frame and thread a second tube fitting (with a
straight bore) into the reducer bushing.
d) Center the tube in the frame and tighten the ferrule nuts on the tube fittings.
e) Install one tube fitting with a stepped bore on each end of the tube and tighten the ferrule nuts.
Assemble the frame adapter to the frame (XL1, XL2-S, and XL2)
1. Thread a 20 mm eye bolt into the tapped hole provided at the top of the frame adapter (108) and sling
to a hoist.
2. Install the frame adapter (108) to the frame using eight hex head bolts (370B).
Maintenance
Models 3180, 3181, 3185, and 3186 Installation, Operation, and Maintenance Manual
91