1 overview of connections, Overview of connections – Festo Контроллер двигателя SEC-ST User Manual
Page 50
Advertising
3. Installation
3−8
Festo SEC−ST−48−6−P01−EN en 0606c
Please note
·
Make sure that the cables are provided with strain relief.
In the case of boom arm and multi−axis operation, cables
which are subject to mechanical stress must be laid in a
drag chain.
3.3.1
Overview of connections
Fig. 3/6:
Complete structure of SEC−ST with motor and
controller
Advertising