1 overview of connections, Overview of connections – Festo Контроллер двигателя SEC-ST User Manual

Page 50

Advertising
background image

3. Installation

3−8

Festo SEC−ST−48−6−P01−EN en 0606c

Please note

·

Make sure that the cables are provided with strain relief.
In the case of boom arm and multi−axis operation, cables
which are subject to mechanical stress must be laid in a
drag chain.

3.3.1

Overview of connections

Fig. 3/6:

Complete structure of SEC−ST with motor and
controller

Advertising