Working with the ika, C 6000 global standards/isoperibol calorimeter – IKA C 6000 isoperibol Package 2/12 User Manual

Page 20

Advertising
background image

20

System test

The system test is performed automatically every time the IKA

®

C 6000 global standards/isoperibol is

switched on.

During the system test the start screen is shown

again; clicking on the „Show details“ button pro-

vides detailed information.

Safety instructions regarding information on and

activation of the calorimeter are then shown on
the IKA

®

Homepage.

The system test includes the following steps:

- Testing the external water circuit with the cir-

culation pump and heater (approx. 30 to 45

seconds).

- Testing the internal water circuit with the con-

denser and water supply, plus the heater once

again (approx. 30 to 45 seconds).

- Testing whether the temperature of the cooling

waters is correct for the selected function of the
IKA

®

C 6000 global standards/isoperibol. (ap-

prox. 60 to 180 seconds).

If any one of these steps is not performed suc-

cessfully, the system test stops with an error mes-

sage. After all the components have been che-

cked the system test can be restarted the same as

after a manual cancellation. To do this, press the

„Restart“ button.

With the system test in standby, no measure-

ments can be made. However it is possible to se-

lect some menu options.

Working with the IKA

®

C 6000 global standards/isoperibol calorimeter

Switching on the device

The IKA

®

C 6000 global standards/isoperibol is

switched on with the On/off switch. The cover
opens automatically. A start screen appears for
about 30 seconds, during which the hardware is
initialised and the software is loaded.

Working with the IKA

®

C 6000 global standards/isoperibol calorimeter

Advertising