IKA C 6000 isoperibol Package 2/12 User Manual

Page 6

Advertising
background image

6

We recommend that you send the

decomposition vessel to our factory for

inspection, and if necessary, repair after

1000 tests or after one year or sooner

depending on use

A pressure test must be performed after a

decomposition vessel has reached or exceeded the

recommended number of ignition cycles. Once

the pressure test has been performed a release

code can be entered to enable the decomposition

vessel to be used for further measurements (see

the sections “Maintenance of the Decomposition

Vessel” and “Inputting a Service Code”).

The warning message will then disappear!

Note: You can then continue to use the device /

decomposition vessel.

Contact the IKA

®

Service Department to perform

the pressure test. Comply with the safety

instructions in this respect. The user will be given

specifi c instructions on the relevant screen.

For the purposes of these operating instructions a

technical expert is someone

1. who guarantees to conduct the tests properly

on the basis of his training, knowledge and

experience gained through practical work,

2. who is suffi ciently reliable,

3. who is not subject to any instructions in terms

of the test activity,

4. who has suitable test equipment if necessary,

5. who can provide appropriate proof of the

requirements listed in 1.

National directives and laws must be

observed for operating pressure vessels!
Anyone operating a pressure vessel must keep it in

a proper condition, operate it properly, supervise

it, carry out the necessary maintenance and repair

work immediately and implement the safety

measures required in the circumstances.

Pressure vessels must not be used if they have

defects which could pose a risk to staff or third

parties.

The decomposition vessel is manufactured

in accordance with the directive for pressure

equipment 97/23/EC. This is indicated by the CE

symbol with the ID number of the notifi ed body.

The decomposition vessel is a category III pressure

device. The decomposition vessel has undergone

an EC prototype test. The CE declaration of

conformity confi rms that this decomposition

vessel corresponds to the pressure device

described in the EC prototype test certifi cate. The

decomposition vessel has undergone a pressure

test with test pressure of 33 MPa and a leakage

test with oxygen at 3 MPa.

Refer also to the operating instructions for the

C 6010/ 6012 decomposition vessel, see chapter

„maintenance of the decomposition vessel“.

Decomposition vessels are experiment autoclaves

and must be tested by a technical expert after

each use.

Individual use is understood here to include a

series of experiments performed under roughly

the same conditions in terms of pressure and

temperature. Experiment autoclaves must be

operated in special chambers

The decomposition vessels must undergo repeated

tests (internal tests and pressure tests) performed

by the technical expert. The frequency of these

tests is to be determined by the operator on the

basis of experience, type of operation and the

material used in the decompositionvessel.

The declaration of conformity becomes invalid if

mechanical modifi cations are carried out to the

experiment autoclaves or if tightness can no longer

be guaranteed as a result of major corrosion (e.g.

pitting by halogens).

In particular the threads on the pressure vessel and

the union nut are subject to considerable stress

and must therefore be checked regularly for wear.

The condition and function of the seals must be

checked and ensured by way of a leakage test

(see the operating instructions for the C 6010/

6012 decomposition vessel, section „Leaktightness

testing“).

If the maintenance, and especially the pressure

testing, is not performed or is performed

incorrectly, there is a risk the decomposition vessel

may burst or an uncontrolled internal fi re may

occur at the electrodes which could burn away

the seals (oxyacetylene torch effect), thus posing

a risk to life and limb.

Only technical experts may perform pressure

tests and service work on the decomposition

vessel.

Safety instructions

Advertising