Rod assembly installation -40 – JLG 1850SJ Service Manual User Manual

Page 210

Advertising
background image

SECTION 5 - BASIC HYDRAULIC INFORMATION & HYDRAULIC SCHEMATICS

5-40

– JLG Lift –

3121619

INSERTING ROD OFF-CENTER CAN DAMAGE PISTON AND CYLINDER BARREL
SURFACES. USE EXTREME CARE WHEN INSTALLING CYLINDER ROD, HEAD,
AND PISTON.

13.

Clamp barrel securely and support rod. Insert piston end
into barrel cylinder. Do not damage or dislodge piston
loading O-ring and seal ring.

14.

Continue pushing rod into barrel until cylinder head
gland can be inserted into barrel cylinder.

NOTE:

Apply JLG Threadlocker (P/N 0100011) or equivalent to
capscrews.

15.

Secure cylinder head (26) and washer ring (27) with

eight capscrews (28).

16.

Install two counterbalance valves (3) with new O-rings in

valve block. Torque to 50-55 ft-lb (67-75 Nm)

17.

If removed, install the cylinder length sensor. See Sec-

tion 5.3, Cylinder Length Sensor.

1

29

27

28

29

Figure 5-75. Rod Assembly Installation

Advertising