JLG 1850SJ Service Manual User Manual

Page 62

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3-20

– JLG Lift –

3121619

13.

Install O-Ring (54) and Motor Flange (55). Apply Loctite
243 or equivalent to six Screws (56). Install and torque
Screws to 177 ft-lb (240 Nm).

14.

Check completed Drive Hub assembly rotates freely.

15.

Install Pin (4) and Cover (3). Secure with two Screws (2).
Torque to 7 ft-lb (10 Nm).

FAILURE TO PROPERLY FILL DRIVE HUB WITH OIL BEFORE OPERATION WILL
RESULT IN EQUIPMENT FAILURE AND COULD CAUSE DEATH, SERIOUS INJURY,
OR DAMAGE TO PROPERTY AND EQUIPMENT.

16.

Follow oil change procedures and refill Drive Hub before
operating equipment.

54

55

56

4

3

2

Advertising