SECTION 4 - BOOM & PLATFORM

4-8

– JLG Lift –

3121619

2.

Install the side rear wear pads and shims. Coat the
retaining bolts with JLG threadlocking compound P/N
0100011 and secure the wear pads with the bolts and
washers. Torque the bolts to 40.5 ft.lbs. (55 Nm).

3.

Install the top and bottom rear wear pads and shims.
Coat the retaining bolts with JLG threadlocking com-
pound P/N 0100011 and secure the wear pads with the
bolts and washers. Torque the bolts to 40.5 ft.lbs. (55
Nm).

4.

Install the section 5 retract ropes to into the holes in the
side of section 5. Place tape over the holes to keep the
cables in place during assembly as shown.

5.

Install the section 5 extend ropes into the mounting
holes in the bottom of section 5. Place tape over the
holes to keep the cables in place during assembly as
shown.

NOTE:

Boom section 4 weighs approximately 1898 lbs. (861 kg).