JLG X19J Operator Manual User Manual
Page 115
HATZ DIESEL ENGIN
* First operation.
** At least every 3 months.
*** At least every 5 years.
# Anyway every year. If the tightening is not correct replace the nuts with two new with the same
specifications and restore the connection without using oil or grease.
As regards complete service of the engine, see the manual supplied by the engine manufacturer or
download it from the website: www.hatz‑diesel.com
PART
INTERVENTION
BEFORE
STARTING
AS NEEDED
INTERVAL (HOURS)
10
50
100
250
500
1000
2000
DRY AIR FILTER
CHECK, CLEAN
•
CHANGE
•
ENGINE OIL
CHECK LEVEL
•
•
CHANGE
•
*
•
ENGINE OIL FILTER
CLEAN
•
CHANGE
•
FUEL FILTER
CLEAN
•
CHANGE
•
WATER SEPARATOR
CLEAN AND DRAIN
WATER
•
•
*
•
COOLING SYSTEM
CHECK FLUID LEVEL
•
TOP UP/CHANGE
FLUID
•
HYDRAULIC OIL
CHECK LEVEL
•
CHANGE
•
HYDRAULIC OIL
FILTER
CHANGE CARTRIDGE
•
*
•
ARTICULATED JOINT
POINTS
GREASE
•
*
•
BATTERY
CHECK ELECTROLYTE
LEVEL
•
•
REDUCTION GEAR
OIL
CHECK LEVEL
•
CHANGE
•
*
•
MACHINE
GENERAL PERIODICAL
CHECKS
•
•
*
EXTENSION ARM
INTERNAL SLIDING
RING
CHECK WEAR
•
CHANGE
•
TURNTABLE BOLT
TIGHTENING
CHECK
•
*
•
NUT FIXING PINS
BASKET
CHECK TORQUE
200 Nm
•
#
X19JR0620113
BOOM LIFT MODELS X19J
JLG
111