JLG X19J Operator Manual User Manual

Page 115

Advertising
background image

HATZ DIESEL ENGIN

* First operation.
** At least every 3 months.
*** At least every 5 years.

# Anyway every year. If the tightening is not correct replace the nuts with two new with the same
specifications and restore the connection without using oil or grease.

As regards complete service of the engine, see the manual supplied by the engine manufacturer or

download it from the website: www.hatz‑diesel.com

PART

INTERVENTION

BEFORE

STARTING

AS NEEDED

INTERVAL (HOURS)

10

50

100

250

500

1000

2000

DRY AIR FILTER

CHECK, CLEAN

•

CHANGE

•

ENGINE OIL

CHECK LEVEL

•

•

CHANGE

•

*

•

ENGINE OIL FILTER

CLEAN

•

CHANGE

•

FUEL FILTER

CLEAN

•

CHANGE

•

WATER SEPARATOR

CLEAN AND DRAIN

WATER

•

•

*

•

COOLING SYSTEM

CHECK FLUID LEVEL

•

TOP UP/CHANGE

FLUID

•

HYDRAULIC OIL

CHECK LEVEL

•

CHANGE

•

HYDRAULIC OIL

FILTER

CHANGE CARTRIDGE

•

*

•

ARTICULATED JOINT

POINTS

GREASE

•

*

•

BATTERY

CHECK ELECTROLYTE

LEVEL

•

•

REDUCTION GEAR

OIL

CHECK LEVEL

•

CHANGE

•

*

•

MACHINE

GENERAL PERIODICAL

CHECKS

•

•

*

EXTENSION ARM

INTERNAL SLIDING

RING

CHECK WEAR

•

CHANGE

•

TURNTABLE BOLT

TIGHTENING

CHECK

•

*

•

NUT FIXING PINS

BASKET

CHECK TORQUE

200 Nm

•

#

X19JR0620113

BOOM LIFT MODELS X19J

JLG

111

Advertising