JLG X19J Operator Manual User Manual

Page 124

Advertising
background image

3. Engage the track links with the sprocket and position the other end of the track on the
idler roller.

4. Turn the sprocket in reverse (7) pushing the track shoes insi‑
de the chassis (8).

5. Position the track using a steel pipe and turn the sprocket
again.

6. Ensure that the track links are correctly engaged in the
sprocket and in the idler roller.

7. Adjust the track tension.

8. Rest the undercarriage on the ground.

7.12 CHECKING TIGHTNESS OF NUTS AND BOLTS

Depending on the use of the platform, it is essential to check the parts and the nuts and bolts
which are subject to loosening.
Pay particular attention to the chassis components, such as idler roller, travel gear motors,
sprockets and guide rollers. Check that they are tightened sufficiently, according to the fol‑
lowing table.

The values indicated are to be applied unless different instructions are given in this manual.

8

7

5202

02B

H19

X19JR0620113

120

BOOM LIFT MODELS X19J

JLG

Advertising