1 before you start, Product completeness check, Connector lay-out – 2N VoiceBlue MAX v1.5 User Manual

Page 10

Advertising
background image

10

2N TELEKOMUNIKACE a.s., www.2n.cz

®

2.1 Before You Start

Product Completeness Check

Before installing this product, check whether the

delivery

2N VoiceBlue MAX

®

complies with the following packing list.

Package

pcs

2N VoiceBlue MAX

®

1

Power supply adapter

1

Long antenna

1

Ethernet cable

1

Quick Start manual

1

Rubber feet

4

Connector Lay-Out

The following connectors are mounted on the

bottom:

2N VoiceBlue MAX

®

10/100BaseT Ethernet connector
4xFXS connector RJ-45
RESET button – press for a short time to restart the GSM gateway and for a long
time to restart the GSM gateway and download the factory settings.
Antenna connector for all GSM/UMTS channels
SIM holder

Find a power supply connector (DC Jack 2.1mm) and type plates at the rear.

Caution

Make sure that you are equipped with all system components necessary
for putting

in operation (SIM card, VoIP phone

2N VoiceBlue MAX

®

and/or duly configured SIP line of your SIP Proxy, an available 100BaseT
socket and a PC for initial settings, analogue telephone).

Advertising