INFICON HPG400 ATM to High-Vacuum Gauge User Manual

Page 38

Advertising
background image

38

tina31e1 (2004-05) HPG400 v1.om

Put the gauge into operation.

Operate the gauge for

≈10 minutes at atmospheric pressure. If

the gauge was operated within the hot cathode range, a cooling-
down time of

≈30 minutes is to be expected (gauge tempera-

ture = environmental temperature).

Adjust the gauge:

HPG400 without display

353-520, 353-522

HPG400 with display

353-521, 353-523

Insert a pin (

≈ш1.3Ч50mm) through the opening <FULL SCALE> and

push the button inside for at least 5 seconds.

_

Automatic adjustment in progress (

≈10 s

)

.

_

Adjustment completed.

The following procedures are described:
• HV adjustment Pirani
• ATM adjustment Pirani

• Pin, approx. ш1.3 Ч 50 mm (e.g. abent open paper clip)

The Pirani part is automatically adjusted by the hot cathode part when the gauge is
activated and a pressure value of 1 … 3×10

-3

mbar is reached for the first time.

Pirani adjustment at
atmospheric pressure

6.2.2 Pirani Adjustment

(HPG400-SD,
HPG400-SP)

Required tools

HV adjustment Pirani

Advertising