5.2. Installation






Caution:

Installation of the C.U.-unit / Installation of the magnetic valve

• Always turn off the unit and disconnect the mains cable (38) from the power source

before installing the unit.

• The control cable with plug (56) of the C.U.-cooling unit or the magnetic valve always

have to be connected or disconnected in absence of current.

Control of the C.U.-cooling unit or the magnetic valve.

• With the C.U.-cooling unit or the magnetic valve the menupoint

–CoolingMax- has to be adjusted to a value of > 0 (Recommendation: 100%). So the
automatical control of the cooling can become active
(see 8.6. Limits).

Installation of the C.U.-unit

JULABO Order-No.

9790100

C.U. cooling unit

44

45

56

52

60

62

61

64

63

K11

K14

56a

• Use the leader pins (62) to fix

the assembly sheet (60) into the
base (61) of the circulator and
fasten with hexagon screws
(63).

• Push the C.U.-cooling unit to the

circulator and screw it tightly at
the points (64).

• Connect the cooling circulation

for the oil (52, 53) (open end
wrench SW19). When doing this
hold the tube at position K11
with an open end wrench SW21.

• Connect the cooling water (44, 45) (open end wrench SW15)

When doing this hold the tube at position (K14) with an open end
wrench (SW14)

• Fix the control cable (56) at the control exit (56a) and screw it tightly.

Cooling capacity at 2 l/min flow of cooling water.

Temperature <IntAct>

[°C] 350

250

150

75

Cooling capacity

[kW]

12

8

4

1