Control technology | PROFIBUS communication manual

Commissioning of PROFIBUS

Overview of the commissioning steps

22

L

DMS 2.2 EN 07/2011 TD17

6

Commissioning of PROFIBUS

This chapter provides information about how to commission the Lenze control system

with PROFIBUS.
Depending on the field devices used, the following Lenze engineering tools are required:

 »PLC Designer«
 »Engineer«
 »Global Drive Control« (GDC)

Tip!
For using other fieldbus systems, you may require further engineering software.

More information can be found in the corresponding communication manuals.

6.1

Overview of the commissioning steps

The main commissioning steps are listed in the following table:

Step

Action

Software to be used

1.

Planning the bus topology ( 23)

2.

Installing field devices

( 23)

3.

Creating a project folder

( 24)

4.

Storing the device data base files (GSE) ( 24)

5.

Commissioning of field devices ( 25)

»Engineer«

»GDC«

6.

Creating a PLC program ( 26)

»PLC Designer«

7.

Configuring the PROFIBUS master ( 29)

»PLC Designer«

8.

Configuring the PROFIBUS slave ( 33)

»PLC Designer«

9.

Compiling project data ( 36)

»PLC Designer«

10.

Logging on to the control system with the »PLC Designer« ( 36)

»PLC Designer«

11.

Loading and starting the PLC program ( 36)

»PLC Designer«