A-19 a-19, A-19, For circuit board – Rockwell Automation 20G PowerFlex SCR Bus Supply User Manual

Page 61

Advertising
background image

Specifications

A-19

PowerFlex SCR Bus Supply User Manual

Publication 20S-UM001G-EN-P

Table A.G 1000A Unit Spare Part Numbers/Descriptions

Figure A.11 1000A Unit Printed Circuit Board Locations (top view)

Item Availability

(1)

Description

Rockwell Catalog No.

Qty.

1

1000A SCR Set

SK-20S-MCO600-22IO1

6

4

Yes

Fan Assembly

(2)

SK-D9-FAN2

1

5

1000A MOV Assembly

SK-20S-VBKSDK110

1

7

Yes

40A Fuse (Precharge fuses F7…F11)

(3)

SK-20S-F070B040S or
Westcode Type F070B040S or
Ferraz Shawmut Type 6.921CPgRC14.51 40

5

11

Yes

1000A, 700V Fuse (AC fuses F1…F6)
Torque to 25 N•m (221 lb•in).

SK-20S-069UR2S1000B or
Westcode Type 069UR2S1000B or
Ferraz Shawmut Type 6.9URD32TTF1000

6

12

Yes

Fuse Monitoring Switch

SK-20S-MS3V1-5

6

13

85 °C Thermostat

SK-20S-SWT85KSDKRW

1

14

1000A SCR Wire Harness

SK-20S-ZY110-1000

1

17

Yes

1000A Snubber Circuit Board

SK-20S-PR-GR3-5

1

19

600A and 1000A Cover

SK-20S-RW9582300-A

1

22

600A and 1000A Enclosure

SK-20S-RWU600-1000

1

23

15 µF, 1000V Capacitor

SK-20S-E62K85153D1W

2

26

4.7K Ohm, 130W Resistor

SK-20S-RW36FST4K7K

2

27

4.7 Ohm, 45W Resistor

SK-20S-RW33FST4R7K

1

28

1000A Bus Bar Set

SK-20S-BBKSDK110

1

31

Terminal Block Assembly

SK-20S-TBKSDKRW

1

32

40 mm tall x 40 mm O.D. Insulator
with M10 Thread

SK-20S-IN551520

5

34

Yes

Gate Driver Circuit Board

(4)(5)

SK-D9-SCRGDB1

1

35

Yes

480V SCR Precharge Circuit Board

(4)(6)

SK-D9-SCRPRE1-D

1

36

Yes

690V SCR Precharge Circuit Board

(4)(6)

SK-D9-SCRPRE1-F

1

37

Yes

Master/Slave or Slave/Slave Wire Harness

(7)

SK-20S-D9-CBL1-DF

1

38

Yes

Precharge Relay

SK-20S-CA2KN31F7

1

(1)

Important: SCR Bus Supplies are designed to be field maintained only. Normal maintenance components (fan, fuses, fuse monitor
switch, printed circuit boards (precharge, gate, and snubber), and precharge relay are available. Additional catalog numbers are
provided for troubleshooting and technical support information only.

(2)

Extensive disassembly is required to replace the fan assembly. Please consider using Rockwell Automation Remanufacturing Services.

(3)

When replacing these fuses, always properly position them so that their fuse trip indicators (plungers) point toward the fuse trip
detection board.

(4)

This is an ESD sensitive component.

(5)

Not required for 1000A Standalone unit, but required for 1000A Master unit or 1000A Slave unit (both mounted in lower location).

(6)

Not required for 1000A Slave unit, but required for 1000A Standalone unit (mounted in lower location) or 1000A Master unit (mounted in
upper location).

(7)

Not required for a 1000A Standalone unit, but required to connect an existing 1000A Master or Slave unit to another 1000A Slave unit
(gate driver circuit board mounted in lower location).

Precharge Board

SK-D9-SCRPRE1-x

Gate Drive Board

SK-D9-SCRGDB1

1000A

Slave Unit

1000A

Master Unit

1000A

Standalone Unit

Gate Driver Board
SK-D9-SCRGDB1

Precharge Board

SK-D9-SCRPRE1-x

Advertising