Meter doors, Meter door opening, Meter door closing – Great Plains NTA3007HD Operator Manual User Manual

Page 51: Meter door opening meter door closing

Advertising
background image

Operating Instructions 47

04/04/2011

166-207M

Meter Doors

Refer to Figure 52 and Figure 53
Each meter box has two distinct access doors on the bot-
tom:

Under DRIVING Gear: Clean-Out

(for emptying hopper)

Under DRIVEN Gear: Calibration

(for meter sampling and meter clean-out)

The doors are closed during transport, loading and plant-
ing. They may be open slightly in storage if the hopper
was not completely dry at clean-out.

The doors need to close and seal tightly during planting.
Periodically inspect the lever clamps

for proper ten-

sion, and inspect the elastomer seals for integrity and
resiliency.

Meter Door Opening

Do not open the clean-out door (the door under the upper
DRIVING gear) until preparations have been made to capture
any material to be re-used. Any material present will flow
immediately, possibly in large volume, as soon as the door is
open.

1.

Pull out on a clamp handle

just until it is loose.

2.

Pull out on the other clamp handle. The door nor-
mally will swing down on its own. If not, pull it open
by hand.

Meter Door Closing

Make sure the clamp handles are out or down (not up),
or it will not be possible to close the door.

1.

Use a clean rag to wipe any residual material from
the face of the elastomer seals on the door, and from
the bottom face of the meter box.

2.

Swing the door up into closed position.

3.

While holding the door closed, swing one clamp han-
dle up, past vertical.

4.

Swing the other clamp handle up past vertical.

5.

Inspect the door closure for possible air leaks.
Replace any deformed elastomer seal or damaged
latch clamp.

Null4:

Figure 52

Meter Doors Closed

26346

1

2

3

3

3

3

1

2

3

Null4:

Figure 53

Meter Doors Open

26341

1

2

3

3

Advertising
This manual is related to the following products: