Field operation, Seed monitor – Great Plains NTA3007HD Operator Manual User Manual

Page 68

Advertising
background image

64 NTA907HD or NTA3007HD

166-207M

04/04/2011

Field Operation

Perform all steps in “Pre-Start Checklist” on page 24
and “Final Field Checklists” on page 63.

Null4:

Seed Monitor

The seed monitor performs the following functions:

• Drill lift switch monitoring

• Seed flow blockage

• Fan Speed monitoring

• Hopper material level monitoring

• Hopper air pressure monitoring

• Meter rate monitoring

• Ground speed monitoring

Consult the DICKEY-john Air Cart Control manual for
how to configure reporting and alerts.

Null4:

Do not make short radius turns with the drill in the ground.

Null4:

Note: If you stop in the middle of a pass, raise the drill

and back up 3m (10 ft) before resumption of seed-
ing.

Null4:

Null4:

Null4:

Begin Pass: Hydraulic Circuit Operation

Lift

Fan,

Auger

Fold, Tilt,

Marker

Transport

Hooks

Retract

Extend

Extend

then

Neutral

Neutral

Null4:

Figure 71

CFM Marker Enable

29380

First Pass Operation Checklist

Page

1. Drill unfolded and aligned for first pass,

with opener disks about 3m (10ft) before
field edge.

25

2. Run fan for at least 15 minutes before

planting.

3.

4. CFM MASTER switch on

24

5. Unfold marker on next-row side.

6. Set fan hydraulic circuit to low flow,

engage circuit. Gradually adjust fan
hydraulic flow to obtain 3800 rpm.

83

7. Check seed monitor for alerts.

a

8. Pull forward, lower air drill, and begin

planting for a short distance.

9. Stop. Assess:

• coulter depth

• planting depth

• press wheel operation

10. Make necessary adjustments

71

a.

Refer to Seed Rate manual.

Sharp Field Turns Checklist

Page

1. Fold marker

61

2. Raise air drill

33

3. Make turn

4. Unfold marker on next-row side.

61

5. Lower air drill 3m/10ft before field edge

32

6. Resume planting.

Suspending Planting Checklist

Page

1. Stop tractor

2. Fan hydraulic circuit to Float or Neutral

83

3. Fold Marker

61

4. Raise air drill

33

Ending Planting Checklist

Page

1. Suspend operations as above, then

2. Set transport locks to ROAD

35

3. Set tractor for fold

36

4. Fold wings

37

5. Tilt wings up

38

6. Hook wings

39

7. CFM MASTER off

39

8. Lights ON for transport

Advertising
This manual is related to the following products: