Bio-Rad BioLogic QuadTec™ Detector and Components User Manual

Page 10

Advertising
background image

1.4.2 Power Up and Self-Test

The QuadTec detector is equipped with a universal power supply, which operates with supply voltages from
90 to 260 Volts AC. A manual setting of the supply voltage is not required.

Caution!

Make sure to use a properly grounded power outlet and the power cable provided with the

system.

Before connecting the QuadTec to the Biologic DuoFlow or BioLogic HR system, perform the following
operation:

1.

Connect the power cable to the QuadTec and the grounded power outlet, and then switch on the
device using the ON/OFF switch on the rear of the unit.

2.

The display should show: Kernel v1.0, Bio-Rad BioLogic QuadTec UV-Vis 1.50.

Note: The firmware revision number may change.

3.

Upon power-up, the QuadTec will run through a self-test which includes a check of the electronic
functions. Successful completion of self-test is indicated by SYSTEM TEST OK.

4.

The QuadTec then runs through a wavelength calibration routine. A noise will be heard as the
monochromator moves. If the calibration is successful, the main menu will appear (see page 4-2
Figure 4-1).

If the detector calibration fails or takes an excessively long time, may be a sign that the lamp needs
replacing. See Chapter 6, Troubleshooting.

If the QuadTec self-test is successful, turn off the instrument, and then connect it to your chromatography
system using the instructions given on the following pages.

INTRODUCTION

SYSTEM OVERVIEW

1-5

Advertising