Bio-Rad BioLogic QuadTec™ Detector and Components User Manual
Page 15

2.3 PLUMBING CONNECTIONS TO THE DUOFLOW SYSTEM
The QuadTec has a PEEK flow cell that must be installed by the user. The detector fittings which have been
provided are standard HPLC 10-32 fingertight fittings. The BioLogic system uses 1/4-28 fittings.
To plumb the QuadTec to the BioLogic DuoFlow system:
•
Plumb the detector after the column and before the conductivity monitor with the orange or green
PEEK tubing provided with the DuoFlow. The tubing length between the column and the detector
should be as short as possible.
•
The flow is from the left to the right side of the instrument as shown in the picture below.
Figure 2-4. Plumbing to the DuoFlow System
USE WITH THE BIOLOGIC DUO-FLOW SYSTEM
SYSTEM INSTALLATION AND SETUP
2-4
A
B
A
B
WORKSTATION
AVR7-3
INJECT
VALVE
MIXER
BUFFER A and B
CONTROLLER AND
COLOR MONITOR
CONDUCTIVITY
MONITOR
INSTRUMENT
BUS
7
1
2
3
4
5
WASTE
INJECT
PORT
RINSE
WASTE
2128
DIVERTER
VALVE
COLLECT TO MODEL 2128
FRACTION COLLECTOR
COLUMN
6
QUADTEC
DETECTOR