0" REQUIRED

CLEARANCE

2" MIN

CLEARANCE

3" MIN CLEARANCE

36" MIN CLEARANCE

TOP VIEW

0" REQUIRED

CLEARANCE

6" MIN

CLEARANCE

Installing The Furnace

(cont'd)

10

CLEARANCE REQUIREMENTS 

The minimum clearances required when installing the furnace into 
any area are as follows: 

Back and Sides = 3 inches (from combustible material) 
Top = 6 inches (from combustible material) 
Front = 36 inches (for ease of servicing) 
Furnace Right Side and Air Duct = 2 inches 
Furnace Left Side and Air Duct = zero clearance 
Sides of Furnace Ducts = zero clearance 

The clearance areas must be kept open and free of debris.  Do not 
place anything on top the furnace.  If the furnace is installed in a 
small, enclosed area (less than 400 square feet), the area must be 
well ventilated.  For ventilation purposes, a minimum of a 24” X 24” 
opening must be installed, if not already present, into the area where 
the furnace is located.  In addition, a 6” X 6” non­closing type 
register must be cut into the return air duct of the furnace to minimize 
heat build­up in the room.  (See Figure 3 for a depictition of clearance 
specifications.) 

3 

FIGURE  3 

FURNACE SET-UP 

For  cross  reference  to  number  coded  components,  see 
the  Exploded  View  Diagram  and  the  Furnace  Parts  List 
in  this  manual.  Refer  to  Table  2  in  the  Shipping  section 
of  this  manual  for  a  list  of  items  each  furnace  should 
contain. 

Step  1 

Unbox the brick storage cabinet 

Step  2 

Remove painted front panel (11) of cabinet by removing the sheet metal screws on the lower edge. 
Rotate bottom edge of panel out to detach it from the cabinet. 

Step  3 

On the right side of the cabinet, remove the screws around the limit bar louvre panel (63).  (See 
Figure 4 for reference to the location of this panel and the screws.) 

Step  4 

Slide the sides and back painted outer panels (9,71, & 73) backwards as one assembly and remove 
from cabinet. 

Step  5 

Use the handles on the brick storage cabinet to move it to its installation location.  Set aside for now. 

Removal  of  the  limit  switches  (67)  on  the 
right  side  of  the  brick  storage  cabinet 
may  be  necessary  to  avoid  damage  to 
these  switches  during  the  move. 

Step  6 

Remove the base assembly (50) from its box and move 
it to the installation location. Discard the wooden 
packaging from the top of the base. Locate and set 
aside the hardware package shipped on top of the base 
assembly. 

Do  NOT  install  the  furnace  on  its 
shipping  pallet. 

4 

FIGURE  4 

NOTE

NOTE