Installing The Heater

(cont'd)

12 

Step  13 

Connect the brown thermocouple lead wire (79) in the wiring harnesses to the core temperature 
sensor (68). The yellow wire of the thermocouple lead attaches to the screw stud marked with a 
yellow dot. The red wire attaches to the screw stud marked with a red dot. 

The  brown  thermocouple  lead  wire  must  be  routed  in  a  fashion  that  ensures  it 
will  be  protected  from  physical  damage  and  does  not  come  into  contact  with  any 
live  electrical  connections  in  the  limit  bar  area.  Incorrect  polarity  on  the  core 
temperature  sensor  will  cause  the  furnace  to  continue  to  charge,  even  when  a 
high  charge  level  has  been  achieved. 

Step  14 

Carefully install the limit bar channeling plate (61) to provide air seal around wiring harnesses 
(65 & 70). 

Step  15 

Install the limit bar louvre panel (63). 

BRICK LOADING 

Step  1 

Remove the sheet metal screws around the outer edge of the galvanized front panel (12) and set the 
panel aside. 

Step  2 

Carefully lift the three insulation blankets (3, 4, & 5), one at a time, and drape them over the top of 
the  furnace. 

Use  face  mask,  gloves,  and  long  sleeved  garments  when  handling  insulation 
materials  in  accordance  with  generally  accepted  safety  practices. 

Step  3 

Remove the aluminized steel panel (10) by pulling out at the top. 

Step  4 

Remove the heating elements (17) and the packing material from the brick core cavity. To ensure 
adequate room for brick loading, the top or bottom 1" x 4" (nominal) wooden core spacer can be used 
to hold inner brick cavity walls apart. 

The  core  spacer  is  packaging  material  and  can  be  discarded  after  brick  loading 
is  complete. 

Step  5 

To minimize the amount of brick debris falling into the core blower, place the cardboard packaging 
material found inside the brick cavity over the core blower opening. 

Step  6 

Load the brick (15), one row at a time, starting at the back working forward. Below is a list of 
installation tips to aid in the brick loading process: 

¢ 

Be sure  to remove  loose 
brick debris as the furnace 
is being loaded to prevent 
uneven stacking of the 
bricks. 

¢ 

Use the half brick (boxes 
marked) in the proper rows 
and in the correct positions. 
The half bricks should be 
loaded in rows 4 and 8 in the 
DLF30 and in rows 5 and 10 for the DLF40, with row 1 being at the bottom.  (See Figure 6 for 
the correct position of the half bricks.) 

The  purpose  of  the  half  brick  is  to  make  brick  loading  easier  by  evening  out  the 
stacking.    From  an  operation  perspective,  it  is  not  essential  they  be  placed  in  the 
rows  recommended  for  each  model.  The  rows  recommended  simply  make  for  the 
best  fit. 

5

NOTE

NOTE

NOTE

NOTE 

FIGURE  6 

ELEMENT TERMINATION 

HALF BRICK 

DLF 30: LOAD IN ROWS 4 AND 8 

DLF 40: LOAD IN ROWS 5 AND 10

Advertising
This manual is related to the following products: