4 preparing boiler for servicing, 5 returning a boiler to service, 6 change in ownership – AERCO Modulex EXT 1530 - 3060 User Manual

Page 14: 12 operational limits of the boiler, Modulex ext

Advertising
background image

MODULEX EXT

1530, 1912, 2295, 2677, 3060 Boilers

Installation, Operation & Maintenance Manual

1.11.4 Preparing Boiler for Servicing

Before carrying out any cleaning or servicing turn off the electrical supply to the boiler by

means of the ON/OFF switch and/or by means of the appropriate shutdown devices.

1.11.5 Returning a Boiler to Service

Before putting a boiler, which has been unused for a length of time, back into service,

rinse the entire domestic hot water system, allowing the water to flow an appropriate

amount of time in order to circulate throughout the entire system.

1.11.6 Change in Ownership

If the appliance is sold or transferred to another owner, or if the present user moves from

the installation site and leaves the appliance installed, ensure that the manual stays with

the appliance so that it can be consulted by the new owner and/or installer.

1.12 Operational Limits of the Boiler

Max. boiler temperature: 180° F (80° C)

Max Allowable Working Temperature ASME: 200 °F

Max. Allowable Working Pressure ASME: 92 psi


Page 14 of 138

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913

OMM-0095_0E

12/01/14

Phone: 800-526-0288

GF-139

Advertising