24 electrical connections, 1 regulations in force, Modulex ext – AERCO Modulex EXT 1530 - 3060 User Manual

Page 44

Advertising
background image

MODULEX EXT

1530, 1912, 2295, 2677, 3060 Boilers

Installation, Operation & Maintenance Manual

3.24 Electrical Connections

3.24.1 Regulations in Force

The electrical connections to the boiler must be made in accordance with all applicable local

codes and the latest revision of the National Electrical Code,

ANSI/NFPA-70.

Installations should also conform with

CSA C22.1 Canadian Electrical Code Part 1, if installed in

Canada.

CAUTION!

The boiler must be electrically grounded in accordance with local

codes, or in absence of local codes, with the National Electrical

Code, ANSI/NFPA 70 and/or the CSA C22.1, Electrical Code.
The gas, D.H.W. (Domestic Hot Water), and C/H system pipes

must NEVER be used for electrical grounding.

Ensure that the above safety electrical requirements are instituted. If in doubt, ask a

professionally qualified technician to check the appliance’s electrical system.
AERCO does not accept responsibility for any damages arising from failure to correctly

electrically ground the boiler.
It is necessary that a qualified technician verify that the electrical system is adequate to satisfy

the appliance’s maximum power requirements, indicated on the data plate, verifying in particular

that the cables are suitable for the appliance’s maximum power use.

CAUTION!

For the appliance’s general electrical supply, the use of adaptors,

multiple sockets, and/or extension cords is strictly forbidden.
The use of any power supply equipment implies the observance of

several fundamental rules, such as:

Do not touch the appliance with any wet part of your body

and/or while barefooted.

Do not pull the supply cables.

Do not expose the boiler to sunlight, rain, etc., unless it is

explicitly prepared and installed for such use.

Do not permit children or inexpert people to use the appliance.

3.24.2 Mains Electrical Supply Connection (120 V – 60 Hz)

Mains electrical requirements call for a 120V, 60 Hz power source. The electric power

connections to the junction box of the boiler are shown in Figure 3-18.
The power supply to the boiler, 120 VAC - 60 Hz single phase, must be made in the JUNCTION

BOX of the boiler, with three core cable H05VV-F (PHASE - NEUTRAL - EARTH) according to the

polarity of the phase and neutral power supply, with phase and neutral terminals indicated on the

plug.
It is required to fit a double pole switch on the electrical supply line, having a contact separation in

both poles, in an easily accessible position in order to provide a means to remove power from the

unit during servicing.

Page 44 of 138

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913

OMM-0095_0E

12/01/14

Phone: 800-526-0288

GF-139

Advertising