Ecler ECLERNET MANAGER User Manual

Page 203

Advertising
background image

203

It is recommended at this point to check that all the configuration for audio, events, GPIs, GPOs, etc.
works properly with the associated hardware. In the image, the real audio activity can also be monitored
on the level meters of the MIMO88. Another important checking is offered by the UCPs, using for them
the project in Deploy mode and any networked UCP client. All of this guarantees that in the future, when
the project runs on a WPmSCREEN, everything will work as expected:


After the above checks, the procedure for transferring the project to a WPmSCREEN is the following:


If the computer and the WPmSCREEN have been previously connected to the same local network with
compatible IP addresses and masks, access the Connect and send option in the WPmSCREEN menu:

A window will appear for selecting the WPmSCREEN you want to transfer the project to, with a list of
units automatically detected by the application:



After selecting, press Connect and you'll be asked for confirmation to overwrite the existing project (if
any) in the WPmSCREEN. (Note: it is highly recommended to save a copy of the project by using
previously the Connect and get
option):

Advertising