Out of production – LAARS HP-M2 Series - Installation, Operation and Maintenance Instructions User Manual

Page 30

Advertising
background image

Page 30

LAARS Heating Systems

Figure 25. Testing Limit Circuit (You Must Complete Figure 24 First).

Ð

1

2

3

4

5

6

7

8

9

RED

RED

CN6

"CONTROL"

LIMIT CIRCUIT APPEARS OK -
RECYCLE BOILER A FEW TIMES AFTER
PLUGGING IN "CONTROL" PLUG

CHECK FOR CONTINUITY ACROSS
OPERATING CONTROL LIMITS

CHECK FOR CONTINUITY ACROSS
SAFETY LIMIT CONTACTS

REPLACE SAFETY LIMIT

REPLACE OPERATING
CONTROL

ALL LIMITS OK.
BOILER SHOULD CYCLE PROPERLY
ON A CALL FOR HEAT OR HOT WATER

CHECK FOR CONTINUITY ACROSS
PRESSURE SWITCH CONTACTS
(BOILER PRESSURE ABOVE 12 PSI)

NOTE: AFTER COMPLETING LIMIT CIRCUIT TESTING, RECYCLE BOILER A FEW TIMES. IF BOILER DOES NOT
RECYCLE CONNECT A JUMPER TEMPORARILY BETWEEN THE RED WIRES. IF BOILER STARTS REMOVE JUMPER
AND TEMPORARILY JUMP EACH SAFETY CONTROL UNTIL THE DEFECTIVE CONTROL IS LOCATED. NEVER
LEAVE A SAFETY CONTROL JUMPED.

CONTINUITY

CONTINUITY

CONTINUITY

NO CONTINUITY

NO CONTINUITY

VIOLET

YES

PUMP OPERATES

REPLACE
PRESSURE
SWITCH

CHECK PUMP
(FIGURE 30)

NO

Р

Р

Р

NO CONTINUITY

Р

Р

Р

Р

Р

YES

NO - UNPLUG CN6 FROM
BOILER CONTROL AND
TEST AS INDICATED

Í

1. SWITCH BOILER ON
2. CHECK FOR 24V AT PIN #6

NOTE: PLUG ORIENTATION MAY
DIFFER FROM DIAGRAM

OUT OF

PRODUCTION

Advertising