Out of production – LAARS HP-M2 Series - Installation, Operation and Maintenance Instructions User Manual

Page 33

Advertising
background image

H Series

Page 33

CLEAR

1. TURN OFF BOILER SWITCH
2. REMOVE BOTH TUBES FROM

STACK SWITCH AND DISCONNECT
ELECTRICAL WIRES

3. CHECK FOR CONTINUITY ACROSS

SWITCH TERMINALS

NOTE: CHECK TUBES ON STACK SWITCH FOR PROPER CONNECTIONS

1. ATTACH TUBES DISCONNECTED

FROM STACK SWITCH TO U-TUBE
MANOMETER

2. TURN ON BOILER TO OPERATE

BLOWER

3. MANOMETER INDICATES 1.5" W.C.

OR GREATER

REPLACE STACK
SWITCH P/N 2400-110

RECONNECT STACK SWITCH
TUBES AND CHECK FOR
CONTINUITY BETWEEN
STACK SWITCH TERMINALS
WITH BLOWER OPERATING

CHECK FOR VENT OBSTRUCTIONS

CLEAR OBSTRUCTIONS &
RECONNECT TUBES &
ELECTRICAL WIRES TO
STACK SWITCH - START
BOILER & RUN THROUGH A
FEW CYCLES

CHECK BLOWER
FIGURE 27

STACK SWITCH OK

REPLACE STACK
SWITCH P/N 2400-110

CONTINUITY
(0 OHMS)

NO CONTINUITY
( OHMS)

CONTINUITY
(0 OHMS)

OBSTRUCTED

NO

YES

Р

Р

Р

Р

Р

Р

Р

Р

NO CONTINUITY

( OHMS)

Figure 28. Checking Stack Switch (You Must Complete Figure 27 First).

OUT OF

PRODUCTION

Advertising