Taking measurements, Operation taking measurements – YSI ProDSS User Manual
Page 34
32
Operation
Taking measurements
For the highest accuracy, calibrate the instrument before taking measurements (
).
1. Create site and Data ID lists for logged data (if applicable) (
).
2. Set the logging method (single or interval) (
).
3. Set the Auto Stable parameters (if applicable) (
).
4. Verify that the sensors and/or port plugs are correctly installed in all bulkhead ports (
).
5. Install the sensor guard (
).
6. Insert the sensors into the sample.
NOTE: Make sure to submerge the sensors completely. If using a depth sensor, submerge to where the cable
assembly attaches to the bulkhead.
7. Move the bulkhead in the sample to release any air bubbles and to provide a fresh sample to the sensors.
8. Wait for the sensor/s to stabilize in the sample.
9. If logging, select Log One Sample or Start Logging (
).