Gas Category

This boiler is for use only on G20 natural gas, but may be

converted for use on G31 gas (Propane L.P.G.).

Gas Safety (Installation and Use) Regulations

In your own interests and that of safety, it is the Law that ALL

gas appliances are installed by

competent person approved

at the time by the Health and Safety Executive in accordance

with the current issue of the above regulations.

Control of Substances Hazardous to Health

Under Section 6 of The Health and Safety at Work Act

1974, we are required to provide information on substances

hazardous to health.
The adhesives and sealants used in this appliance are cured

and give no known hazard in this state.

Insulation Pads / Ceramic Fibre

These can cause irritation to skin, eyes and the respiratory

tract.
If you have a history of skin complaint you may be susceptible

to irritation. High dust levels are usual only if the material is

broken.
Normal handling should not cause discomfort, but follow

normal good hygiene and wash your hands before eating,

drinking or going to the lavatory.
If you do suffer irritation to the eyes or severe irritation to the

skin seek medical attention.

Manual Handling

With regards to the “Manual Handling Operations, 1992

Regulations”, it should be noted that each appliance module

exceeds the recommended weight for a one person lift.
The handling of the boiler may involve lifting, pushing and

pulling, the use of a sack truck may be required.
The following handling techniques and precautions should be

considered:
- Grip the boiler at its base
- Be physically capable
- Use safety clothing where appropriate, e.g. gloves, safety

footwear.
Ensure safe lifting techniques are used
- Keep back straight.
- Avoid twisting at the waist.

- Avoid upper body/top heavy bending.
- Always grip using the palm of the hand.
- Use designated hand holds.
- Keep load as close to body as possible.
- Always use assistance if required.

Electrical Supply

The electrical installation must be installed by a

competent

person approved at the time by the Health and Safety

Executive

and in accordance with the relevant standards.

The boiler and immersion heater must be earthed.

All system components shall be of an approved type and all

wiring to current I.E.E. wiring regulations.
External wiring must be correctly earthed, polarised and in

accordance with the relevant standards.
In GB this is BS 6891.
In IE this is the current edition of I.S.813 “Domestic Gas

Installations”.
The boiler must be connected to a permanent 230V ac, 50Hz

supply.
Connection of the whole electrical system of the boiler,

including any heating controls, to the electrical supply must

be through one common isolator and must be fused 3 Amp

maximum.
Isolation should be by a double pole switched fused spur box,

with a minimum gap of 3mm for both poles. The fused spur

box should be readily accessible and preferably adjacent to

the appliance. It should be identified as to its use.
Alternatively connection can be made through an unswitched

shuttered socket and 3A fused 3-pin plug both to the current

issue of BS 1363 may be used, provided they are not used in

a room containing a bath or shower.
Wiring to the boiler must be PVC 85

O

C insulated cable, not

less than 0.75mm

2

(24/0.20mm).

Immersion Heater - a thermostatically controlled immersion

heater with manual reset is fitted to the cylinder as a back

up for domestic hot water in the event of the boiler being

inoperable. The immersion heater

MUST be wired separately

using 3kW 13amp wiring and in accordance with the relevant

standards.

Important Information

WARNINGS

Gas Leak or Fault

Turn off the gas emergency control valve immediately. Eliminate all sources of ignition, i.e.smoking,

blowlamps, hot air guns etc.

Do not operate electrical lights or switches either on or off. Open all doors and windows, ventilate the area.

Metal Parts

This boiler contains metal parts (components) and care should be taken when handling and cleaning,

with particular regard to edges.

Sealed Components

Under no circumstances must the User interfere with or adjust sealed parts.