15 replacement of parts – Glow-worm Ultrapower sxi Range User Manual

Page 59

Advertising
background image

59

15.13 Heating Expansion Vessel

For access, refer to section 15.1.
Drain the boiler heating circuit, refer to section 15.1.
Remove the retaining clip from the flexible hose at the central

heating pump, see diagram 15.7.
Remove the flexible hose from the pump, ensure the ‘O’ ring

on the connection is seated correctly before re-fitting.
Remove the expansion vessel clamp, see diagram 15.7.
Slide the expansion vessel forward and out from the retaining

bracket.
Remove the flexible hose union nut from the expansion

vessel. When re-fitting ensure that a new sealing washer

is fitted and that the elbow of the flexible connection faces

towards the front of the appliance.

15.14 Heat Exchanger

Refer to Manual Handling Operations, 1992.
For access, refer to section 15.1.
Drain the boiler heating circuit, see section 15.1.
Drain the boiler domestic water circuit, see section 15.1.
Disconnect the flue connection, refer to section 10.
Remove the silencer, refer to section 13.2.
Remove the igniter unit electrical connections, refer to

diagram 15.2.
Refer to section 13.4 for removal of the fan, gas valve and

burner assembly.

15 Replacement of Parts

Diagram 15.7

13354

Diagram 15.8

SILENCER

BRACKET

EARTH

LEAD

IGNITION

LEAD

HEAT

EXCHANGER

SECURING

NUT (4 OFF)

SECURING

SCREW

(2 OFF)

CLAMP

SECURING

SCREW (2 OFF)

CLAMP

IGNITER

UNIT

13351

RETAINING

BRACKET

PRIMARY

EXPANSION

VESSEL

FLEXIBLE HOSE

CONNECTION

SECURING

SCREW (2 OFF)

EXPANSION

VESSEL

CLAMP

RETAINING

CLIP

Top view of CH pump

CH PUMP

FLEXIBLE HOSE

CONNECTION

CH PUMP

Advertising