Chapter 3: Getting Started

Product Service 1-800-522-7658

9

Moving the Cabinet

Move the cabinet, attached to its pallet, by using a floor jack, or a furniture
dolly underneath the unit. DO NOT move the cabinet by tilting it onto a
hand truck.
Verify all Procedure Station components are included, and then move the
cabinet to its final location.

Preparing the Procedure Station for Operation

Installation instructions (Labconco P/N 1056800) are attached to the sash; if
these instructions are missing or unclear, contact Product Service at 800-821-
5525 or 816-333-8811.

Installing the Procedure Station on an Existing
Work Surface

Note: The Procedure Station is very top heavy. Use caution when lifting or
moving it.

When installing onto an existing work surface or benchtop, ensure that the
structure can safely support the combined weight of the cabinet and any
related equipment. The work surface should be at least as wide as the cabinet
and 31 inches deep to properly support the unit.
The work surface should be level, smooth and durable. The surface should
be nonporous and resistant to the disinfectants and chemicals used in
conjunction with the Procedure Station. This will allow a proper seal to form
between the bottom of the cabinet and the work surface.
A hole or notch may be cut in the supporting surface in the right front corner
to accommodate the optional drain valve.

Installing the Cabinet on a Labconco Base Stand

Labconco offers accessory Base Stands in a variety of configurations to suit
the particular needs. Stands can be ordered with adjustable telescoping legs
or with a manually or electrically adjustable hydraulic lift.